Skip to content
Yardox

Concrete calculator

Work out how much concrete to order for a slab, strip footing, round column or fence post holes, and how many bags of dry mix that is.

What are you pouring?

01
Slab10 ft10 ft4 in
%

5 % covers an uneven base and spillage. Use 10 % for rough excavations.

Concrete to order1.30 yd³· 59 bags
Add this calculator to your website

Free for any website: paste this code where the calculator should appear. It keeps itself up to date, fits its height to the content and links back to the full page with the explanations.

How to use it

  1. 01Pick what you are pouring: a slab, a strip footing, a round column or post holes. Add more elements if the job has several parts, for example a patio slab and four post holes.
  2. 02Measure the inside of the formwork or the hole, not the outside of the boards. Enter each size in the unit you measured it in; you can mix centimetres and metres or feet and inches.
  3. 03For post holes, enter the depth of the concrete itself. If you put a layer of gravel at the bottom, subtract it from the hole depth.
  4. 04Leave 5 % for waste unless the ground is rough. Choose the bag you plan to buy, or "Ready-mix only" if a truck will deliver.
  5. 05Copy the order list and take it to the supplier.

How it is calculated

Each element is a simple solid, so the volume is exact geometry. We add the elements together, then add the waste allowance.

Slab
V = L × W × T
Strip footing
V = L × W × D
Round column
V = π × (Ø / 2)² × H
Post hole
V = π × (Ø / 2)² × D − post area × D
To order
V order = Σ V × (1 + waste)
Bags
bags = ⌈ V order / yield of one bag ⌉

The post is subtracted because it takes up space in the hole that concrete would otherwise fill. For a 100 × 100 mm post in a 300 mm hole that is about 14 % of the hole.

Bag yield is the volume of fresh concrete one bag makes after you add water. We take it from the manufacturer's data sheet, not from the bag weight, because two 25 kg bags of different products can make different volumes.

We round the bag count up only at the very end, so rounding never stacks up between steps.

Worked example

A 10 × 10 ft patio, 4 in thick

  1. Volume: 10 ft × 10 ft × 4 in = 10 × 10 × 0.3333 = 33.33 ft³ = 1.23 yd³ (0.94 m³).
  2. Without waste, 80 lb bags at 0.60 ft³ each: 33.33 / 0.60 = 55.6, so 56 bags.
  3. With 5 % waste: 35.0 ft³, which is 58.3, so 59 bags. At this size, ready-mix is usually cheaper and gives a better slab than hand mixing 59 bags.

Getting the order right

Bags or ready-mix?

Bags make sense for post holes, small pads and repairs. Above roughly half a cubic metre (two thirds of a cubic yard) mixing by hand becomes slow, and a slab poured in several batches can show cold joints. Ask local suppliers about their minimum load and short-load fee.

How much extra?

Formwork bows, excavations are never perfectly flat, and some concrete stays in the mixer and the wheelbarrow. 5 % covers a neat job on a compacted base. For trenches dug in soil or an uneven sub-base, use 8–10 %. Running out halfway through a pour is far more expensive than a little left over.

Check the thickness

Thickness has the biggest effect on volume: 12 cm instead of 10 cm is 20 % more concrete. Measure it in several places and use the average.

Common mistakes

  • Measuring the outside of the formwork boards instead of the inside.
  • Mixing units: entering 10 as metres when you meant centimetres. Watch the diagram; it shows your numbers.
  • Ordering the exact net volume with no allowance for an uneven base.
  • Counting bags by weight ("a 25 kg bag is about 10 litres") instead of using the yield from the data sheet.
  • Forgetting that a post or a sleeve in a hole reduces the concrete needed.

Questions

How many 80 lb bags make a cubic yard?

One 80 lb bag of QUIKRETE Concrete Mix yields about 0.60 ft³. A cubic yard is 27 ft³, so you need 27 / 0.60 = 45 bags, before any waste allowance.

How many 25 kg bags make a cubic metre?

It depends on the product. SAKRET Premium-Beton makes 0.46–0.47 litres per kilogram, about 11.5 litres per 25 kg bag, so a cubic metre needs about 87 bags. Check the data sheet of the product you buy and enter its yield as "Other bag".

How thick should a concrete slab be?

Typical values are 10 cm (4 in) for patios and walkways and 12–15 cm (5–6 in) for driveways that carry cars. Heavier loads, poor ground and reinforcement details depend on your local code and the design, so check with a structural engineer or the building authority.

Does the calculator include reinforcement or gravel?

No. It calculates the concrete only. Rebar and gravel base calculators are in progress.

Guides on this topic

  • How many bags of concrete do I need?

    Bags per cubic yard and per cubic metre for 40, 50, 60 and 80 lb and 25 kg bags, taken from the data sheets, with worked examples for a slab and post holes.

Sources

  1. [1]Concrete Mix No. 1101 – Product Data Sheet. QUIKRETE Companies. Yield per bag: 40 lb ≈ 0.30 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³. Checked November 5, 2026
  2. [2]QUIKRETE 5000 Concrete Mix No. 1007 – Product Data Sheet. QUIKRETE Companies. Yield per bag: 50 lb ≈ 0.375 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³. Checked November 5, 2026
  3. [3]SAKRET Premium-Beton – Technisches Merkblatt (2025-12-02). SAKRET. Yield 0.46–0.47 l of fresh concrete per kg; we use the lower value 0.46 l/kg (11.5 l per 25 kg bag). Checked November 5, 2026
  4. [4]NIST Handbook 44, Appendix C – General Tables of Units of Measurement. National Institute of Standards and Technology. 1 ft = 0.3048 m (exact); 1 yd³ = 27 ft³ = 0.764555 m³. Checked November 5, 2026

Formulas and sources last checked on November 5, 2026. How we calculate