Drywall calculator
Work out boards, studs or ceiling profiles, screws, joint length and joint compound for a stud wall, a wall lining or a ceiling, from the board layout rather than an average per square metre.
Walls
Imperial uses the GA-216 and USG rules: studs at 16 or 24 in, screws every 16 or 12 in, single layer.
3 board columns; the last one is 48 in wide.
Boards and studs
Boarded sides
16 or 24 in on centre. Board edges must land on a stud.
Joint compound
USG: about two 4.5 gal pails of ready-mixed compound per 1000 sq ft.
Leave empty to get only the amount.
Add this calculator to your website
Free for any website: paste this code where the calculator should appear. It keeps itself up to date, fits its height to the content and links back to the full page with the explanations.
How to use it
- 01Enter the length and height of each wall. Add doors and windows; they reduce the area to finish and add two studs each.
- 02Choose whether the wall is boarded on one side (a lining or one face of a partition) or on both, and how many layers each side gets.
- 03Enter the board size and the stud spacing. In Europe Knauf boards are 1250 mm wide on studs at 625 mm; in the US sheets are 4 ft wide on studs at 16 or 24 in.
- 04Check the joint compound rate on your product data sheet and enter the bag or pail size.
- 05Copy the list for the shop. Buy a spare board or two for breakage and mistakes.
How it is calculated
Everything comes from the layout of the boards on the wall, not from an average per square metre.
- Board columns
- columns = ⌈ L / board width ⌉
- Boards per side and layer
- columns × full pieces + ⌈ columns / strips per board ⌉
- Studs
- ⌈ L / spacing ⌉ + 1 + 2 × openings
- Track
- 2 × L
- Screws per side and layer
- (studs + vertical joints) × (⌈ H / screw spacing ⌉ + 1 + horizontal joints)
- Joint compound
- net area × sides × rate
Boards stand upright with their long edges on studs. If the wall is taller than a board, the strip on top of each column is cut from boards that give as many strips as fit in their length.
Knauf W11 sets the screw spacing on studs: no more than 250 mm for a single layer; with two layers, 750 mm for the first layer and 250 mm for the second. For US walls GA-216 and USG give 16 in on studs at 16 in, and 12 in on studs at 24 in.
At a vertical joint both board edges are screwed to the same stud, so each joint adds a line of screws. Openings narrower than a board save no boards, because the offcut around a door is rarely usable.
Joint compound follows the product data sheet. Knauf Uniflott on 12.5 mm boards needs about 0.25 kg per m² of one boarded side with one layer, 0.4 kg with two. USG plans about two 4.5 gal pails per 1000 sq ft.
We round up only once, at the end.
Worked example
Partition 4.0 × 2.6 m, Knauf boards 1250 × 2600 mm, studs at 625 mm, one layer on both sides
- Studs: ⌈4000 / 625⌉ + 1 = 7 + 1 = 8. Track: 2 × 4 = 8 m.
- Board columns: ⌈4000 / 1250⌉ = 4, the last one 250 mm wide. 4 boards per side, 8 in total.
- Screws: (8 studs + 3 joints) × (⌈2600 / 250⌉ + 1) = 11 × 12 = 132 per side, 264 in total.
- Joint filler: 4 × 2.6 = 10.4 m² × 2 sides × 0.25 kg = 5.2 kg.
Getting the order right
Land every edge on a stud
Choose a stud spacing that divides the board width: 625 or 312.5 mm for 1250 mm boards, 16 or 24 in for 4 ft sheets. A board edge between studs has nothing to be screwed to.
Stagger the joints
On a two-layer wall offset the second layer by a board or half a board so its joints do not line up with the first. Stagger horizontal joints between neighbouring columns too.
Plan door openings
Studs beside a door need extra stiffening; Knauf uses reinforced UA profiles for heavy doors. Ask your supplier for the door detail before you order.
Common mistakes
- Spacing studs at 600 mm under 1250 mm boards, so joints fall between studs.
- Spacing screws by eye instead of by the 250 mm or 12–16 in rule.
- Lining up the joints of the two layers.
- Forgetting the second side of a partition when ordering boards and compound.
- Counting joint compound by the square metre of wall when the data sheet gives it per boarded side.
Questions
How many screws and profiles for a drywall ceiling?
Switch the calculator to Ceiling. With Knauf D11 rules, boards go across CD profiles spaced at most 500 mm apart and are screwed every 170 mm; a 4 × 3.5 m ceiling with 1250 × 2000 mm boards takes 6 boards, 31.5 m of CD profile and about 243 screws. Under GA-216, ceiling screws go every 12 in. Hangers are not counted: their spacing comes from the ceiling system sheet.
How many sheets of drywall for a 12 × 8 ft wall?
With 4 × 8 ft sheets standing upright, ⌈12 / 4⌉ = 3 sheets per side. A wall boarded on both sides needs 6.
How many screws per sheet of drywall?
On studs at 16 in with screws every 16 in, a 4 × 8 ft sheet sits on 4 stud lines with 7 screws each: about 28. On a Knauf wall, a 1250 × 2600 mm board sits on 3 studs with 12 screws each: about 36.
What stud spacing should I use?
One that divides the board width. Knauf W11 lists 625, 417 and 312.5 mm for 1250 mm boards; US walls use 16 or 24 in for 4 ft sheets. Tiled walls and taller walls may need closer studs: check the system table.
How much joint compound do I need?
About 0.25 kg per m² of one side for Knauf Uniflott on 12.5 mm boards, or about two 4.5 gal pails per 1000 sq ft for USG ready-mixed compound. Always use the figure on your product data sheet.
Guides on this topic
- How many sheets of drywall do I need?
Sheets of drywall or plasterboard for walls and ceilings, stud and screw spacing from Knauf, USG and Danogips, and joint compound, with worked examples.
Related calculators
Sources
- [1]Detailblatt W11.de Knauf Metallständerwände (08/2015; stud spacings re-checked in edition 01/2024). Knauf Gips KG. Screw spacing on CW studs: single layer ≤ 250 mm; double layer: first layer ≤ 750 mm, second layer ≤ 250 mm (vertical boards, 1250 mm wide). Stud spacing 625 mm for 1250 mm boards.. Checked November 5, 2026
- [2]Knauf Uniflott, Produkt-Datenblatt K4604_DSP.de (03/2025). Knauf Gips KG. Joint filler about 0.25 kg/m² for one side of 12.5 mm boards (Vorsatzschale) and 0.4 kg/m² for two layers of 12.5 mm; 0.5 and 0.8 kg/m² for a wall boarded on both sides. Bags of 5 and 25 kg.. Checked November 5, 2026
- [3]USG FAQ: fastener spacing for gypsum panels. USG. Walls: screws 16 in apart on framing 16 in on center, 12 in apart on framing 24 in on center. Ceilings: screws 12 in apart or closer on framing 16 in on center or closer.. Checked November 5, 2026
- [4]All Things Gypsum: Attachment of Gypsum Board (Walls & Ceilings, 2006). Michael Gardner, Gypsum Association. Confirms the GA-216 wall screw spacing: 16 in on 16 in framing, 12 in on 24 in framing, for wood and steel studs. Ceilings: framing typically 16 or 24 in on center; single-layer screw attachment 12 in apart.. Checked November 5, 2026
- [5]USG FAQ: coverage of Sheetrock UltraLightweight All Purpose Joint Compound. USG. About two 4.5 gal pails of ready-mixed compound to finish 1000 sq ft of wallboard.. Checked November 5, 2026
- [6]Tehnični list D11: Knauf stropni sistemi (03/2006). Knauf (Slovenia). Ceiling boards are fixed across the CD profiles. One layer of 12.5 mm: screws every 170 mm; two layers: first layer up to 500 mm, second layer 170 mm. Profile spacing 500 mm for boards up to 15 mm.. Checked November 6, 2026
- [7]DANO System-Index, D 90-12 suspended ceiling (technical status 04/2026). Danogips GmbH & Co. KG. Confirms CD 60/27 profiles at ≤ 500 mm with boards laid crosswise, and outer-layer screws at ≤ 170 mm.. Checked November 6, 2026
Formulas and sources last checked on November 6, 2026. How we calculate